S-class W202 Mercedes

1993-2000 of release

Repair and car operation



W202 Mercedes
+ 1.2. General information
- 2. Maintenance
   + 2.1.1. Engine
   2.2. In addition through each 60 000 km of run
   2.3. Every 2 year
   2.4. Every 3-4 year
   - 2.5. Works on maintenance
      + 2.5.1. Engine and system of production of exhaust gases
      + 2.5.2. Box predach/main transfer
      + 2.5.3. Forward bridge / steering
      + 2.5.4. Brakes / tires
      - 2.5.5. Body / internal lighting
         2.5.5.1. Replacement of a nozzle of the pylezaderzhivayushchy filter
         2.5.5.2. Cowl greasing
         2.5.5.3. Check of seat belts
         2.5.5.4. Hatch greasing
   + 2.6. Care of the car
   2.7. Engine start from the auxiliary accumulator
   2.8. Car towage
   2.9. Car lifting
   2.10. The tools applied to maintenance
+ 3. Engines
+ 4. Greasing system
+ 5. Cooling system
+ 6. Heating, ventilation
+ 7. Ignition system
+ 8. Fuel system
+ 9. Transmission
+ 10. Running gear
+ 11. Steering
+ 12. Brake system
+ 13. Body
+ 14. Electric equipment
+ 14.2. Electroschemes


b47c026d b47c026d

2.5.5.4. Hatch greasing

GENERAL INFORMATION

Necessary special tool:

 – two aligning bolts which can be made independently on the sizes specified in drawing;
 – cпециальные pincers or similar tool.

Necessary quickly spent materials:

 – antifrictional Megsedes-Benz paste 001 989 1451 or similar.
PERFORMANCE ORDER
1. Open on 3/4 hatch.
2. Unhook in front from spring clips a covering of the shifted panel of a roof of a body.
3. Completely open the hatch.
4. Take up a hatch covering.
5. Unscrew screws with a crosswise shliyets (arrow) and remove directing level.
6. Close the hatch.
7. Unscrew at the left and on the right nuts (arrow).
8. Take up the hatch.
9. Blow the compressed air a spillway from above to the left and on the right up.
10. Check floating blocks on absence of damages, if necessary replace them.
11. Clear floating blocks and grease them with antifrictional paste.
12. Clear directing levels, grease a working surface.
13. Insert aligning bolts (shooter) at the left and on the right into aligning opening.
14. Insert from above the hatch. Get nuts, without tightening them hardly.
15. By means of the special pincers represented in drawing previously clamp the hatch and then hardly tighten nuts.
16. Open the hatch.
17. Screw directing level.
18. Insert and fix spring clips a hatch covering.